Make your own concrete spa

Want to build your own concrete hot tub but don't know where to start? This step-by-step guide walks you through the different stages involved in building the custom concrete spa shown above.
Whether you're researching concrete hot tub construction, a built-in concrete spa or a gunite spa project, this guide provides a practical overview of the main construction stages.
Please note that this guide is intended only as general assistance for building your spa. We strongly recommend consulting qualified professionals who can help you select the appropriate materials for your project.
Concrete Hot Tub Specifications
  • Dimensions: 240cm x 240cm
  • Massage system: 6 hydrotherapy jets - 1 x 3 HP massage pump - 2 suction fittings
  • Filtration system: 1 skimmer - 1 sand filter with 3-way valve - 1 x 0.33 HP filtration pump - 1 x 3kW heater
  • Spa control system: BALBOA BP601 control box - TP800 topside control panel
  • Lighting: SEAMAID sequential light with remote control
  • Thermal insulation: Perimeter polystyrene insulation - 240 x 240cm Premium insulated hot tub cover
  • Structural features: Perimeter bench seating - Concrete form block construction - Waterproof tanking coating
The construction work shown below was carried out by professional mason David Bureau from Innov'Maçonnerie.
This guide is intended only to outline the different construction stages used to build Mr. Robichon's concrete hot tub. We always recommend consulting a qualified professional when selecting materials and determining the appropriate masonry techniques for your installation. BOOSPA cannot be held responsible for any construction defects or improper workmanship.
How to Build a Concrete Hot Tub: Step-by-Step Guide
Concrete hot tub planning icon
Step 1: Creating the Plan
This is probably the most important stage of the project and should never be overlooked.
The plan will accurately define the location of the different spa components and serve as a roadmap throughout the entire concrete hot tub construction project.
It will also determine the overall layout of the spa, including all the masonry elements that need to be built.
Detailed concrete hot tub construction plan
Here is the construction plan for the concrete hot tub featured in this guide.
Here are a few explanations regarding the placement of certain components:
  • The ball valves have two functions:
    • Closing the plumbing circuits so you can work on a spa component such as the pumps or sand filter without having to drain the hot tub
    • Directing suction exclusively through the main drain when draining the spa to the sewer
  • The filtration return is located on the opposite side from the skimmer to provide optimum water circulation
  • The massage circuit uses two suction fittings to provide optimum massage performance. Since the hydrotherapy jets do not have Venturi air inlets, two suction lines are required to reduce flow restriction
  • The plumbing access trench is important because it provides enough room to work on the pipes and identify any potential leaks
  • A drain equipped with a sump pump must be installed to prevent rainwater from flooding the equipment area
Good to Know
Of course, this plan is only an example. You can modify it to suit your own concrete spa or hot tub project.
However, please follow these guidelines:
  • If you want to install an air blower, the air jets must be located less than 1 meter from the waterline. Ideally, we recommend installing them in the bench seating.
  • The hydrotherapy jet located farthest from the massage pump should be less than 5 meters away.
  • If you want to control the spa equipment using pneumatic air buttons, these buttons must be located no more than 5 meters from the pump or blower they control.
    Concrete hot tub excavation icon
    Step 2: Excavation
    Probably the least exciting part of the project. We recommend using a mini excavator. If you're feeling particularly ambitious, a pickaxe and shovel will be your best friends for many hours...

    Make sure you excavate the entire footprint of the concrete hot tub, including the equipment area, which was excavated at a later stage on the spa shown in this guide. Doing everything at once means you'll only need the mini excavator once for the entire project.
    Concrete hot tub excavation with mini excavator Concrete spa excavation with mini excavator
    Make sure the excavation is perfectly level.
    Good to Know
    Allow an additional 20 to 30cm around the structure to make it easier to build the slab formwork and install the concrete blocks used for the hot tub structure.
    As specified in the construction plan, installing a drain is essential.
    It will help prevent the excavation from flooding during the masonry work.
    Once the concrete hot tub is completed, it will also help prevent rainwater from flooding the different spa components.
    Drain system for concrete hot tub
    Drain pit equipped with a sump pump.
    Concrete slab icon
    Step 3: Building the Concrete Slab
    The slab is one of the most important structural components of the entire concrete hot tub project.
    It will support the complete spa structure, the water inside the hot tub and the people using it.
    In our case, the slab therefore needs to support more than 4 metric tons across an area of approximately 9m².

    We therefore recommend a 20cm-thick fiber-reinforced concrete slab.
    Good to Know
    • The slab can also be reinforced using steel reinforcement, in which case fiber-reinforced concrete is not required.
    • In both cases, we recommend using a concrete admixture to improve the waterproofing properties of the structure.

    Building the slab involves several stages, which are explained below:
    Step 3A: Build the Formwork
    We won't go into detail about how to build the formwork for the concrete slab.
    Simply make sure the form boards are securely held in place using reinforcing bars so they cannot move when the concrete is poured.

    Fill the additional excavated area with gravel to provide optimum support.
    Concrete hot tub slab formwork
    You can also see that an extension was installed to raise the drain.
    Good to Know
    One question you may have at this stage is: why not install steel mesh to reinforce the slab?
    This is a valid question. A slab without steel mesh can provide sufficient structural strength for this concrete hot tub project provided that fiber-reinforced concrete is used and the ground is stable.

    If you have any doubts about soil stability, you can reinforce the slab with steel reinforcement. Different types of reinforcement can be used, including reinforcement cages, welded wire mesh and reinforcing bars.
    Step 3B: Install the Main Drain
    Installing the main drain before pouring the concrete slab is essential. We recommend securing it in position using a small amount of fast-setting concrete.
    If your slab uses steel reinforcement, make sure the main drain extends 4 to 5cm above the upper reinforcement mesh to allow for the thickness of the concrete and waterproof finish.
    Concrete hot tub main drain positioning
    Unfortunately, we don't have a photo illustrating this stage.
    Good to Know
    The main drain must, of course, be connected to the filtration plumbing. Make sure the connection is completely watertight.
    You won't be able to access this connection once the slab has been poured!
    Step 3C: Pour the Main Concrete Slab
    Mineral fiber-reinforced concrete was used to provide improved thermal insulation and help reduce heat loss.

    Ask a professional mason for advice. They can recommend materials suitable for concrete hot tub construction.
    This slab is a crucial part of the project. It provides the long-term stability and foundation of the entire structure.
    Pay particular attention to the quality of the slab and allow the required curing time before moving on to the next stages.
    Pouring concrete hot tub slab 1 Pouring concrete hot tub slab 2
    Make sure the slab is perfectly smooth and level, and remember to protect the main drain.
    Good to Know
    The pipes were installed inside protective sleeves to prevent damage to the plumbing embedded in the concrete.
    Step 3D: Pour the Equipment Area Slab
    A second slab was built for the spa equipment area.
    As mentioned previously, this section was added later on the project shown here. We recommend building it directly at this stage.
    Concrete hot tub equipment area layout
    In our case, this section was built after completing the main structure.
    Good to Know
    You'll notice that the equipment area slab is raised by 30cm compared with the lower slab.
    This elevation is important because it helps prevent pumps and electronic spa equipment from being flooded.
    Step 3E: Mark Out the Structure
    Accurately mark out the complete hot tub structure as well as the plumbing access trenches.
    Accurate positioning is essential and should be carried out with maximum precision.

    Always refer back to the construction plan created during the first stage.
    Marking concrete hot tub layout on slab 1 Marking concrete spa layout on slab 2
    Don't hesitate to add plenty of reference marks for positioning the concrete form blocks.
    Good to Know
    Take into account the thickness of the waterproofing coating as well as the thickness of the tile if you want to mark the final finished dimensions on the concrete slab.
    In the following photo, only the final interior dimensions of the lower section were marked in black.
    Final concrete hot tub layout markings
    Final result after marking out the structure.
    Concrete spa masonry icon
    Step 4: Building the Concrete Hot Tub Structure
    Once the slab is completely dry, it's time to start building the exterior structure of the concrete spa.
    Good to Know
    Allow the full 31-day slab curing period.
    The concrete must be completely cured before carrying out any additional masonry work.

    The structure is built in several stages, as explained below:
    Step 4A: Build the Exterior Structure
    We won't provide detailed instructions for building this structure.

    Instead, here are a few photos showing the masonry work used for this particular concrete hot tub.
    As mentioned previously, the equipment area was added later and is therefore not shown in these photos.
    Concrete hot tub exterior structure plan
    Concrete hot tub exterior masonry 1 Concrete hot tub exterior masonry 2 Concrete hot tub exterior masonry 3
    Steel reinforcement was installed at all four corners of the exterior structure. The slab was drilled to a depth of 10cm to secure the reinforcing bars.
    Step 4B: Reinforce the Interior Structure
    The interior structure must be able to retain 2.5 metric tons of water. It therefore needs to be built with great care.
    Steel reinforcement is essential for the internal structure. Reinforcing bars are installed every 20cm and anchored directly into the slab to a depth of 10cm.
    Concrete hot tub interior reinforcement 1 Concrete hot tub interior reinforcement 2
    Horizontal perimeter reinforcement was also installed in every row of concrete form blocks.
    Good to Know
    The concrete form blocks were modified to accommodate the horizontal perimeter reinforcement.
    Step 4C: Pre-Position the Concrete Blocks
    The title says it all: pre-position the concrete form blocks and the built-in spa fittings, making the required cutouts.
    Check the level regularly.
    Positioning concrete hot tub blocks 1 Positioning concrete hot tub blocks 2 Positioning concrete hot tub blocks 3
    The cutouts should be made according to the construction plan. Please disregard the additional jets shown in the photos.
    Step 4D: Pre-Set the Spa Components
    This stage consists of positioning and securing the spa components inside the concrete form blocks.
    Each component must be secured in place with concrete.

    Several important details are shown in the following photo:
    Installing fittings in concrete hot tub structure
    Position the components according to the specifications listed below.
    • The wall fittings must extend by 1cm to allow for the thickness of the waterproofing and finishing material that will later be applied to the inside walls of the concrete hot tub
    • DO NOT EMBED the threaded sections shown in the diagram in concrete under any circumstances
    • The end of the topside control panel cable conduit must terminate inside the concrete form block. The other end must pass through the block and exit into the plumbing access trench
    • Remember to connect the lighting cable conduit to the light wall fitting. This conduit must also exit on the plumbing trench side
    • As with the jet wall fittings and suction fittings, allow the skimmer to extend by 1cm
    Step 4E: Build the Lower Structure
    As with the interior spa structure, install reinforcement in the lower structure.
    Lower concrete hot tub structure reinforcement 1 Lower concrete hot tub structure reinforcement 2 Lower concrete hot tub structure reinforcement 3
    Vertical reinforcing bars plus horizontal perimeter reinforcement in every row of concrete form blocks.
    Good to Know
    The slab was drilled 10cm deep to secure the reinforcing bars. The spacing between the reinforcing bars is 20cm.
    Step 4F: Fill the Concrete Form Blocks
    First, create the mold for the topside control panel using a polystyrene board.
    This will create a recessed cavity for the control panel.

    Fill the concrete form blocks with concrete.
    Also fill the trench between the interior and lower sections of the spa with standard gravel up to 10cm below the upper edge of the bench.

    The bench will also be insulated with a 6cm layer of polystyrene.
    The remaining 4cm below the upper edge of the bench will be filled with concrete.
    Creating concrete spa control panel recess
    Filling concrete hot tub blocks Insulating concrete hot tub bench
    Cut the polystyrene insulation to achieve the result shown here.
    Good to Know
    The polystyrene insulation helps reduce heat loss and also significantly reduces the amount of concrete required to complete the bench.
    Concrete hot tub waterproofing icon
    Step 5: Waterproofing the Concrete Hot Tub
    It's time to waterproof your concrete spa. If you filled it with water at this stage, your hot tub would look more like a giant strainer...
    Step 5A: Apply the Waterproof Tanking Coating
    We will waterproof the concrete hot tub shell using a waterproof tanking coating.

    We recommend hiring a professional for this stage or, at minimum, obtaining professional advice when selecting the waterproofing product.
    THIS IS NOT A STANDARD MASONRY COATING. This waterproofing layer is responsible for making the concrete spa shell completely watertight.
    Applying concrete hot tub waterproofing coating
    Application of the first waterproofing coat.
    Several coats will need to be applied, particularly inside the hot tub shell. Once again, follow the recommendations provided by the professional or waterproofing product manufacturer.
    The required drying time between coats must be strictly followed to achieve proper waterproofing.
    Concrete spa waterproofing coating final result
    Final result after all waterproofing coats have been applied.
    Good to Know
    Once the waterproof coating has been applied and is completely dry, we recommend working on the inside corners to bevel them before installing the tile.
    It is better to avoid sharp edges inside the hot tub to reduce the risk of cuts.
    Step 5B: Apply the Protective Layer
    The waterproofing coating can deteriorate over time due to heat, water pH and the chemicals used to sanitize and maintain hot tub water.
    It is therefore important to apply a protective layer over the waterproof coating.

    You can skip this stage if you install tile or mosaic, as these will act as the protective layer.
    In this project, even though tile was eventually installed, a double protection system was chosen: tile plus a protective coating.
    Ask a specialist for advice on which protective product should be applied over your waterproofing system.
    Applying protective coating inside concrete hot tub
    Final result after applying the protective layer inside the concrete spa shell.
    Good to Know
    The tile installation was postponed for one year. This is why a protective layer was applied inside the hot tub shell.
    A high-temperature waterproof paint was then used.
    Since the final result was not satisfactory, the paint had to be removed before tile was eventually installed.
    Waterproof paint applied to concrete hot tub
    As a bonus, here is the result with blue waterproof paint.
    Step 5C: Install the Topside Control Panel
    Remove the polystyrene mold to expose the recess for the topside control panel.
    Cut the conduit as required so the control panel can be recessed into the structure.
    Adjust the opening until the control panel fits perfectly.

    A stainless-steel plate was fabricated to provide a stable and complete support for the topside control panel.
    You'll also notice that the masonry was shaped to create a sloped surface and prevent water from collecting around the control panel.
    The support was screwed into place and sealed using silicone.
    Installing concrete hot tub topside control panel 1 Installing concrete hot tub topside control panel 2 Installing concrete hot tub topside control panel 3
    Carefully waterproof the support. The seal between the support and the control panel is provided by an M3 supplied with the control panel.
    Concrete hot tub plumbing and electrical icon
    Step 6: Electrical Connections and Hot Tub Plumbing
    Made it this far? Congratulations — you're entering the home stretch!
    Step 6A: Main Electrical Supply
    It's time to start installing the spa equipment. The electrical supply that powers all the components of your concrete hot tub now needs to be installed.

    In this project, a circuit breaker was installed directly inside the equipment area.
    This circuit breaker is connected to a main 32A circuit breaker located in the home's main electrical panel.

    It is important to remember that the breaker in the main electrical panel is connected to a dedicated 40A residual-current device.
    Once again, consult a qualified electrician.
    Only a qualified professional can validate the electrical installation.
    Concrete hot tub electrical supply
    The electrical panel located in the equipment area also includes a 32A circuit breaker. This is not mandatory but was recommended so the power can be shut off without returning to the home's main electrical panel.
    Good to Know
    The residual-current device shuts off the electrical supply when leakage to ground is detected and therefore helps protect people.
    The circuit breaker shuts off the electrical supply when a short circuit is detected and therefore helps protect the equipment.
    Step 6B: Install the Pumps and Sand Filter
    You can also install a rubber pad underneath the equipment to help reduce vibration.

    You'll also notice the black metal support fabricated by Mr. Robichon.
    This support will hold the spa control box. Raising this main component helps protect the equipment if the drainage pump fails.
    This helps reduce the risk of electrical damage to other spa components caused by a general short circuit in the control box.
    Concrete hot tub pumps and sand filter installation
    Consider marking the direction of water flow on the fittings with a permanent marker.
    Step 6C: Insulate the Concrete Hot Tub
    To minimize heat loss, three polystyrene insulation panels were installed around the entire perimeter of the hot tub shell.
    The polystyrene provides additional thermal insulation for the concrete spa.

    Three 6cm-thick panels were installed around the entire perimeter of the hot tub.
    The panels must, of course, be cut where necessary to accommodate the spa plumbing.
    Concrete hot tub insulation panels 1 Concrete spa insulation panels 2
    Don't pay attention to the plumbing connections just yet. We'll cover them in the next section.
    Step 6D: Connect the Hot Tub Plumbing
    It's time to connect all those spa parts that were delivered to you. Refer back to the plumbing plan created during Step 1.
    The setup shown in the following photo is not exactly the same as the original plan.


    During the initial installation, only one suction fitting was connected to supply the massage pump. Because the 3 HP pump is powerful, the available suction flow was not sufficient to provide effective massage performance.
    The second suction fitting was therefore connected as an additional branch on the massage circuit, as shown in the photo.
    Concrete hot tub plumbing connections in equipment area
    The spa control box has been positioned and secured to its support. The various PVC fittings have also been glued.
    Good to Know
    All spa plumbing connections must be assembled carefully using pressure-rated PVC cement.

    Do not skimp on the amount of PVC cement used.
    Every connection must be completely watertight. Repairing a connection after a leak has been discovered can be difficult.

    Sharp-eyed readers may notice that the sand filter waste line had not yet been connected to the drain when this photo was taken.
    Next, connect the different hot tub jets.
    The jets are connected in series. Remember that the jet located farthest from the massage pump must be no more than 5 meters away.
    Concrete hot tub jet plumbing connections
    Use enough PVC cement to achieve a completely watertight connection. The pressure loads at these locations will be significant.
    Step 6E: Connect the Spa Equipment Electrically
    The hardest part is done! All that remains is to connect the different spa components to the control box.

    The connections are relatively simple. The photo below shows the connection points for the different electrical devices.
    The connections use AMP plugs that are very easy to install.
    Balboa BP601 concrete hot tub electrical connections
    BP601 circuit board located inside the spa control box.
    Good to Know
    The components supplied in our concrete spa kits come pre-wired with AMP connectors. Only the lighting is not pre-wired.
    Installing the connector is straightforward. The cables are crimped to the electrical pins, and the pins are then inserted into the plastic AMP connector.
    Step 6F: Protect the Equipment Area and Maintain Access
    The newly installed spa equipment obviously needs to be protected.
    A custom stainless-steel cover was fabricated for the equipment area. We recommend taking measurements directly from your own installation.

    Two hydraulic struts were also installed to make the equipment area easier to access.
    The perimeter of the equipment area was finished with exposed stone.
    Concrete hot tub equipment area protective cover Hydraulic struts for concrete hot tub equipment cover
    Concrete hot tub finishing icon
    Step 7: Finishing the Concrete Hot Tub
    It's time to tile your concrete hot tub. Unfortunately, we weren't able to obtain photos showing the tile installation process.

    We therefore cannot provide detailed information about cutting the tiles, installing them or applying the waterproof grout.
    However, the photos below show the final result once the concrete spa was fully tiled.
    We recommend hiring a professional tile installer.
    The tile installation on the hot tub shown in this guide was completed by RENOVATIO (44).
    Finished tiled concrete hot tub 1 Finished tiled concrete hot tub 2
    The tiles used measure 15cm x 15cm.
    Concrete hot tub tile installation detail 3 Concrete hot tub tile installation detail 4
    Close-up view of the tile cutting and installation.
    Good to Know
    You'll notice that finishing components were also installed.

    Mr. ROBICHON selected anthracite-colored jets for the massage circuit, making them almost invisible once the hot tub is filled with water.
    Other matching finishing components are also available for the spa light, skimmer and main drain.
    Congratulations! You've finally reached the end of the concrete hot tub construction project. All that's left to do now is fill your spa and enjoy it!
    Project Cost
    Here is a detailed breakdown of the total project cost:
    • Filtration kit with sand filter + BP2100 system: €1,690.00
    • 6-jet massage kit: €1,048.00
    • Masonry work (labor + materials): €7,000.00
    • Tile work (labor + materials): €3,000.00
    • Electrical work (labor + materials): €400.00
    • Additional custom components (custom jet finishes, mounting supports, equipment area protection, etc.): €450
    Total project cost: €13,588
    Acknowledgments
    We would like to thank everyone who contributed to this project. Without their help, this concrete hot tub construction guide would not have been possible.
    • ROBICHON Mario, owner of the concrete hot tub featured in this guide. Mr. ROBICHON created the plans and connected the different spa components.
    • BUREAU David, professional mason at Innov'Maçonnerie. Mr. BUREAU completed all of the masonry work. To contact Mr. BUREAU, feel free to visit his Facebook page: Innov'Maçonnerie
    • REVEILLERE Laurent, professional renovation and tile specialist. Mr. REVEILLERE completed the tile work on the concrete spa. To contact Mr. REVEILLERE, feel free to visit his Facebook page: Renovatio
    • JOLY Sylvain, author of this guide. You can contact me at: contact@boospa.com
    Guide author: JOLY Sylvain
    My cart (0)

    No product

    See my cart
    Continue shopping
    Product added
    My account
    Don’t have an account yet ?
    Create my account
    You have an account :
    My account